Yokohama Waterworks Bureau(Japan)

City name Yokohama
Country name Japan
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.95 1.73 2.12
   Fixed Charge 0.42 0.13 0.06
   Variable Charge 0.46 1.47 1.90
  Other Charges
  VAT 0.07 0.13 0.16
Tariff reference date: 01 Apr 2001
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.72 1.41 1.84
   Fixed Charge 0.33 0.10 0.05
   Variable Charge 0.33 1.21 1.65
  Other Charges
  VAT 0.05 0.10 0.14
Tariff reference date: 01 Apr 2001
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 14.25 86.36 211.67
  Connection Charge 6.26 6.26 6.26
  Variable Charge 6.94 73.70 189.73
  Other Charges
  VAT 1.06 6.40 15.68
Tariff reference date: 01 Apr 2001
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 10.78 70.65 183.56
  Connection Charge 4.99 4.99 4.99
  Variable Charge 4.99 60.43 164.97
  Other Charges
  VAT 0.80 5.23 13.60
Tariff reference date: 01 Apr 2001
Water Consumption m3 per BiMonth Tariff (USD per m3) Tariff (JPY per m3)
1st Block to 16 0 0
2nd Block 16.01 to 20 0.34 43
3rd Block 20.01 to 40 1.25 158
4th Block 40.01 to 60 1.79 226
5ft Block 60.01 to 100 2.13 269
6th Block 100.01 to 200 2.32 293
7th Block 200.01 And More 2.53 320
Other Charges Charge (USD) Charge (JPY)
Fixed Charge (USD/Bim) 12.51 1580
Tax (VAT) (%) 8 8

LINK:

Link status: Link Alive
Last Checked: 17-10-2017
Wastewater Consumption m3 per BiMonth Tariff (USD per m3) Tariff (JPY per m3)
1st Block to 16 0 0
2nd Block 16.01 to 20 0.16 20
3rd Block 20.01 to 40 0.93 118
4th Block 40.01 to 60 1.37 173
5ft Block 60.01 to 100 1.85 234
6th Block 100.01 to 200 2.09 264
7th Block 200.01 to 400 2.37 299
8th Block 400.01 to 1,000 2.7 341
9th Block 1,000.01 to 2,000 3.08 389
10th Block 2,000.01 to 4,000 3.29 416
11th Block 4,000.01 And More 3.74 472
Other Charges Charge (USD) Charge (JPY)
Fixed Charge (USD/Bim) 9.98 1260
Tax (VAT) (%) 8 8

LINK:

Link status: Link Alive
Last Checked: 17-10-2017