Empresa Municipal de Agua Potable y Alcantarillado Virgen de Guadalupe del Sur. S.A.(Peru)

City name Guadalupe
Country name Peru
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.36 0.52 0.57
   Fixed Charge 0.03 0.01 0.00
   Variable Charge 0.28 0.43 0.48
  Other Charges
  VAT 0.05 0.08 0.09
Tariff reference date: 15 Jan 2018
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.13 0.21 0.24
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.11 0.18 0.20
  Other Charges
  VAT 0.02 0.03 0.04
Tariff reference date: 15 Jan 2018
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 5.38 25.86 56.95
  Connection Charge 0.41 0.41 0.41
  Variable Charge 4.15 21.51 47.86
  Other Charges
  VAT 0.82 3.95 8.69
Tariff reference date: 15 Jan 2018
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 1.89 10.59 24.03
  Connection Charge 0.00 0.00 0.00
  Variable Charge 1.60 8.97 20.37
  Other Charges
  VAT 0.29 1.61 3.67
Tariff reference date: 15 Jan 2018
Water Consumption m3 per Month Tariff (USD per m3) Tariff (PEN per m3)
1st Block to 8 0.25 0.79
2nd Block 8.01 to 20 0.31 1
3rd Block 20.01 And More 0.53 1.7
Other Charges Charge (USD) Charge (PEN)
Fixed Charge (USD/Mo) 0.41 1.31
Tax (VAT) (%) 18 18

LINK:

Link status: Not Checked
Last Checked: 15-01-2018
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (PEN per m3)
1st Block to 8 0.11 0.35
2nd Block 8.01 to 20 0.11 0.34
3rd Block 20.01 And More 0.23 0.73
Other Charges Charge (USD) Charge (PEN)
Tax (VAT) (%) 18 18

LINK:

Link status: Not Checked
Last Checked: 15-01-2018