Scottsdale Water & Wastewater Treatment(United States)

City name Scottsdale
Country name United States
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.90 0.27 0.14
   Fixed Charge 0.83 0.25 0.12
   Variable Charge 0.00 0.00 0.00
  Other Charges 0.07 0.02 0.01
  VAT
Tariff reference date: 01 Nov 2018
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.21 0.89 0.82
   Fixed Charge 0.23 0.07 0.04
   Variable Charge 0.70 0.70 0.70
  Other Charges 0.28 0.12 0.09
  VAT
Tariff reference date: 01 Jul 2018
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 13.43 13.53 13.68
  Connection Charge 12.40 12.40 12.40
  Variable Charge 0.01 0.03 0.06
  Other Charges 1.02 1.10 1.22
  VAT
Tariff reference date: 01 Nov 2018
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 18.17 44.52 82.16
  Connection Charge 3.50 3.50 3.50
  Variable Charge 10.46 34.87 69.74
  Other Charges 4.21 6.15 8.92
  VAT
Tariff reference date: 01 Jul 2018
Water Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block to 14,158.4 0 0
2nd Block 14,158.41 to 33,980.16 0 0
3rd Block 33,980.17 to 84,950.4 0 0
4th Block 84,950.41 to 184,059.2 0 0
5ft Block 184,059.21 And More 0 0
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 12.4 12.4
Other Percentage Charges (%) 7.95 7.95
Other Volumetric Charges (USD/ccf) 0 0
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block All Consumption levels 0.7 0.7
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 3.5 3.5
Other Percentage Charges (%) 7.95 7.95
Other Wastewater Charges (USD/Mo) 3.1 3.1