JSC Slonimsky Vodokanal(Belarus)

City name Slonim
Country name Belarus
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.40 0.43 0.43
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.40 0.43 0.43
  Other Charges
  VAT
Tariff reference date: 18 Jan 2018
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.31 0.34 0.35
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.31 0.34 0.35
  Other Charges
  VAT
Tariff reference date: 18 Jan 2018
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 6.01 21.39 43.46
  Connection Charge 0.00 0.00 0.00
  Variable Charge 6.01 21.39 43.46
  Other Charges
  VAT
Tariff reference date: 18 Jan 2018
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 4.62 17.16 35.23
  Connection Charge 0.00 0.00 0.00
  Variable Charge 4.62 17.16 35.23
  Other Charges
  VAT
Tariff reference date: 18 Jan 2018
Water Consumption m3 per Month Tariff (USD per m3) Tariff (BYN per m3)
1st Block to 17 0.4 0.81
2nd Block 17.01 And More 0.44 0.89
Other Charges Charge (USD) Charge (BYN)

LINK:

Link status: Not Checked
Last Checked: 04-10-2018
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (BYN per m3)
1st Block to 17 0.31 0.62
2nd Block 17.01 And More 0.36 0.73
Other Charges Charge (USD) Charge (BYN)

LINK:

Link status: Not Checked
Last Checked: 04-10-2018