City of Barrie(Canada)

City name Barrie
Country name Canada
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.45 1.93 2.54
   Fixed Charge 0.67 0.20 0.10
   Variable Charge 0.79 1.73 2.44
  Other Charges
  VAT
Tariff reference date: 01 May 2018
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 2.04 1.97 1.95
   Fixed Charge 0.90 0.27 0.14
   Variable Charge 1.14 1.70 1.82
  Other Charges
  VAT
Tariff reference date: 01 May 2018
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 21.81 96.70 254.36
  Connection Charge 9.99 9.99 9.99
  Variable Charge 11.82 86.71 244.37
  Other Charges
  VAT
Tariff reference date: 01 May 2018
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 30.65 98.52 195.49
  Connection Charge 13.54 13.54 13.54
  Variable Charge 17.11 84.98 181.95
  Other Charges
  VAT
Tariff reference date: 01 May 2018
Water Consumption m3 per BiMonth Tariff (USD per m3) Tariff (CAD per m3)
1st Block to 30 0.79 1.01
2nd Block 30.01 to 60 1.58 2.02
3rd Block 60.01 to 90 2.36 3.04
4th Block 90.01 And More 3.15 4.05
Other Charges Charge (USD) Charge (CAD)
Fixed Charge (USD/Bim) 19.98 25.66

LINK:

Link status: Not Checked
Last Checked: 03-01-2019
Wastewater Consumption m3 per BiMonth Tariff (USD per m3) Tariff (CAD per m3)
1st Block to 30 1.14 1.47
2nd Block 30.01 to 60 1.94 2.49
3rd Block 60.01 And More 1.94 2.49
Other Charges Charge (USD) Charge (CAD)
Fixed Charge (USD/Bim) 27.08 34.78

LINK:

Link status: Not Checked
Last Checked: 03-01-2019