Ostravské vodárny a kanalizace, a. s.(Czech Republic)

City name Ostrava
Country name Czech Republic
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.75 1.75 1.75
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 1.52 1.52 1.52
  Other Charges
  VAT 0.23 0.23 0.23
Tariff reference date: 01 Jan 2019
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.84 1.84 1.84
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 1.60 1.60 1.60
  Other Charges
  VAT 0.24 0.24 0.24
Tariff reference date: 01 Jan 2019
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 26.21 87.36 174.72
  Connection Charge 0.00 0.00 0.00
  Variable Charge 22.79 75.97 151.93
  Other Charges
  VAT 3.42 11.39 22.79
Tariff reference date: 01 Jan 2019
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 27.60 92.01 184.02
  Connection Charge 0.00 0.00 0.00
  Variable Charge 24.00 80.01 160.02
  Other Charges
  VAT 3.60 12.00 24.00
Tariff reference date: 01 Jan 2019
Water Consumption m3 per Month Tariff (USD per m3) Tariff (CZK per m3)
1st Block All Consumption levels 1.52 34.18
Other Charges Charge (USD) Charge (CZK)
Tax (VAT) (%) 15 15

LINK:

Link status: Not Checked
Last Checked: 03-01-2019
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (CZK per m3)
1st Block All Consumption levels 1.6 36
Other Charges Charge (USD) Charge (CZK)
Tax (VAT) (%) 15 15

LINK:

Link status: Not Checked
Last Checked: 03-01-2019