Charleston Water System, Charleston, SC(United States)

City name Charleston
Country name United States
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.78 0.99 0.82
   Fixed Charge 0.86 0.26 0.13
   Variable Charge 0.40 0.57 0.61
  Other Charges 0.52 0.16 0.08
  VAT
Tariff reference date: 01 Jan 2019
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 3.76 3.05 2.90
   Fixed Charge 2.05 0.61 0.31
   Variable Charge 1.71 2.44 2.59
  Other Charges
  VAT
Tariff reference date: 01 Jan 2019
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 26.63 49.25 81.57
  Connection Charge 12.85 12.85 12.85
  Variable Charge 6.03 28.65 60.97
  Other Charges 7.75 7.75 7.75
  VAT
Tariff reference date: 01 Jan 2019
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 56.35 152.51 289.89
  Connection Charge 30.70 30.70 30.70
  Variable Charge 25.65 121.81 259.19
  Other Charges
  VAT
Tariff reference date: 01 Jan 2019
Water Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block to 5.66 0 0
2nd Block 5.67 And More 0.65 0.65
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 12.85 12.85
Other Fixed Charges (USD/Mo) 7.75 7.75

LINK:

Link status: Not Checked
Last Checked: 07-01-2019
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block to 5.66 0 0
2nd Block 5.67 And More 2.75 2.75
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 30.7 30.7

LINK:

Link status: Not Checked
Last Checked: 07-01-2019