Gwinnett County Water Resources(United States)

City name Lawrenceville
Country name United States
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.82 1.79 2.21
   Fixed Charge 0.50 0.15 0.08
   Variable Charge 1.32 1.64 2.14
  Other Charges
  VAT
Tariff reference date: 01 Jan 2019
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 2.48 2.25 2.20
   Fixed Charge 0.33 0.10 0.05
   Variable Charge 2.15 2.15 2.15
  Other Charges
  VAT
Tariff reference date: 01 Jan 2019
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 27.27 89.44 221.27
  Connection Charge 7.50 7.50 7.50
  Variable Charge 19.77 81.94 213.77
  Other Charges
  VAT
Tariff reference date: 01 Jan 2019
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 37.26 112.52 220.04
  Connection Charge 5.00 5.00 5.00
  Variable Charge 32.26 107.52 215.04
  Other Charges
  VAT
Tariff reference date: 01 Jan 2019
Water Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block to 30.28 1.32 1.32
2nd Block 30.29 to 45.42 1.98 1.98
3rd Block 45.43 And More 2.64 2.64
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 7.5 7.5
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block All Consumption levels 2.15 2.15
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 5 5