Virobnyche pidpryemstvo vodoprovidno-kanalizaciynogo gospodarstva m. Saky Manufacturing enterprise of water and sewerage facilities, Saky City(Ukraine)

City name Saky
Country name Ukraine
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.51 0.51 0.51
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.43 0.43 0.43
  Other Charges
  VAT 0.08 0.08 0.08
Tariff reference date: 01 Jun 2018
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.44 0.44 0.44
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.37 0.37 0.37
  Other Charges
  VAT 0.07 0.07 0.07
Tariff reference date: 01 Jan 2019
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 7.61 25.35 50.71
  Connection Charge 0.00 0.00 0.00
  Variable Charge 6.45 21.49 42.97
  Other Charges
  VAT 1.16 3.87 7.73
Tariff reference date: 01 Jun 2018
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 6.63 22.08 44.17
  Connection Charge 0.00 0.00 0.00
  Variable Charge 5.61 18.72 37.43
  Other Charges
  VAT 1.01 3.37 6.74
Tariff reference date: 01 Jan 2019
Water Consumption m3 per Month Tariff (USD per m3) Tariff (RUB per m3)
1st Block All Consumption levels 0.43 26.74
Other Charges Charge (USD) Charge (RUB)
Tax (VAT) (%) 18 18

LINK:

Link status: Not Checked
Last Checked: 05-10-2018
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (RUB per m3)
1st Block All Consumption levels 0.37 26.03
Other Charges Charge (USD) Charge (RUB)
Tax (VAT) (%) 18 18

LINK:

Link status: Not Checked
Last Checked: 08-01-2019