İstanbul Su ve Kanalizasyon İdaresi(Turkey)

City name Istanbul
Country name Turkey
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.07 1.64 1.80
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.99 1.52 1.67
  Other Charges
  VAT 0.08 0.12 0.13
Tariff reference date: 01 Jan 2019
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.37 0.57 0.63
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.35 0.53 0.58
  Other Charges
  VAT 0.03 0.04 0.05
Tariff reference date: 01 Jan 2019
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 16.00 81.83 180.27
  Connection Charge 0.00 0.00 0.00
  Variable Charge 14.82 75.77 166.91
  Other Charges
  VAT 1.19 6.06 13.35
Tariff reference date: 01 Jan 2019
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 5.60 28.66 63.14
  Connection Charge 0.00 0.00 0.00
  Variable Charge 5.19 26.54 58.46
  Other Charges
  VAT 0.41 2.12 4.68
Tariff reference date: 01 Jan 2019
Water Consumption m3 per Month Tariff (USD per m3) Tariff (TRY per m3)
1st Block to 10 0.86 4.53
2nd Block 10.01 to 20 1.25 6.63
3rd Block 20.01 And More 1.82 9.65
Other Charges Charge (USD) Charge (TRY)
Tax (VAT) (%) 8 8

LINK:

Link status: Not Checked
Last Checked: 14-01-2019
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (TRY per m3)
1st Block to 10 0.3 1.58
2nd Block 10.01 to 20 0.44 2.33
3rd Block 20.01 And More 0.64 3.38
Other Charges Charge (USD) Charge (TRY)
Tax (VAT) (%) 8 8

LINK:

Link status: Not Checked
Last Checked: 14-01-2019