Provo Water Company(Turks and Caicos Islands)

City name Cockburn Town
Country name Turks and Caicos Islands
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 10.16 10.48 10.55
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 10.16 10.48 10.55
  Other Charges
  VAT
Tariff reference date: 04 Mar 2019
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.97 0.31 0.16
   Fixed Charge 0.49 0.15 0.07
   Variable Charge 0.02 0.02 0.02
  Other Charges 0.47 0.14 0.07
  VAT
Tariff reference date: 01 Jul 2015
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 152.40 524.09 1,055.07
  Connection Charge 0.00 0.00 0.00
  Variable Charge 152.40 524.09 1,055.07
  Other Charges
  VAT
Tariff reference date: 04 Mar 2019
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 14.60 15.30 16.30
  Connection Charge 7.31 7.31 7.31
  Variable Charge 0.30 1.00 2.00
  Other Charges 6.99 6.99 6.99
  VAT
Tariff reference date: 01 Jul 2015
Water Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block to 3.79 8.8 8.8
2nd Block 3.8 And More 10.62 10.62
Other Charges Charge (USD) Charge (USD)

LINK:

Link status: Not Checked
Last Checked: 04-03-2019
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block All Consumption levels 0.02 0.02
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 7.31 7.31
Other Wastewater Charges (USD/Mo) 6.99 6.99

LINK:

Link status: Link Alive
Last Checked: 12-04-2018