Wessex Water(UK, England and Wales)

City name Wessex Water
Country name UK, England and Wales
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 3.06 2.94 2.92
   Fixed Charge 0.17 0.05 0.03
   Variable Charge 2.89 2.89 2.89
  Other Charges
  VAT
Tariff reference date: 01 Apr 2019
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 2.85 2.57 2.51
   Fixed Charge 0.41 0.12 0.06
   Variable Charge 2.45 2.45 2.45
  Other Charges
  VAT
Tariff reference date: 01 Apr 2019
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 45.96 147.13 291.66
  Connection Charge 2.60 2.60 2.60
  Variable Charge 43.36 144.53 289.05
  Other Charges
  VAT
Tariff reference date: 01 Apr 2019
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 42.76 128.36 250.64
  Connection Charge 6.08 6.08 6.08
  Variable Charge 36.68 122.28 244.57
  Other Charges
  VAT
Tariff reference date: 01 Apr 2019
Water Consumption m3 per Year Tariff (USD per m3) Tariff (GBP per m3)
1st Block All Consumption levels 2.89 2.22
Other Charges Charge (USD) Charge (GBP)
Fixed Charge (USD/Yr) 31.26 24

LINK:

Link status: Not Checked
Last Checked: 01-04-2019
Wastewater Consumption m3 per Year Tariff (USD per m3) Tariff (GBP per m3)
1st Block All Consumption levels 2.45 1.88
Other Charges Charge (USD) Charge (GBP)
Fixed Charge (USD/Yr) 72.93 56

LINK:

Link status: Not Checked
Last Checked: 01-04-2019