Aalborg Forsyning, Aalborg (Denmark)

City name Aalborg
Country name Denmark
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 3.30 2.55 2.40
   Fixed Charge 0.85 0.26 0.13
   Variable Charge 0.81 0.81 0.81
  Other Charges 0.98 0.98 0.98
  VAT 0.66 0.51 0.48
Tariff reference date: 01 Jan 2019
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 5.16 4.70 4.60
   Fixed Charge 0.53 0.16 0.08
   Variable Charge 3.60 3.60 3.60
  Other Charges
  VAT 1.03 0.94 0.92
Tariff reference date: 01 Jan 2019
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 49.50 127.74 239.52
  Connection Charge 12.77 12.77 12.77
  Variable Charge 12.18 40.61 81.22
  Other Charges 14.64 48.81 97.62
  VAT 9.90 25.55 47.90
Tariff reference date: 01 Jan 2019
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 77.44 234.93 459.92
  Connection Charge 7.95 7.95 7.95
  Variable Charge 54.00 179.99 359.98
  Other Charges
  VAT 15.49 46.99 91.98
Tariff reference date: 01 Jan 2019
Water Consumption m3 per Year Tariff (USD per m3) Tariff (DKK per m3)
1st Block All Consumption levels 0.81 5.3
Other Charges Charge (USD) Charge (DKK)
Fixed Charge (USD/Yr) 153.25 1000
Other Volumetric Charges (USD/m3) 0.98 6.37
Tax (VAT) (%) 25 25

LINK:

Link status: Not Checked
Last Checked: 08-05-2019
Wastewater Consumption m3 per Year Tariff (USD per m3) Tariff (DKK per m3)
1st Block All Consumption levels 3.6 23.49
Other Charges Charge (USD) Charge (DKK)
Fixed Charge (USD/Yr) 95.44 622.75
Tax (VAT) (%) 25 25

LINK:

Link status: Not Checked
Last Checked: 08-05-2019