Municipio de San Martín de Bolaños(Mexico)

City name San Martín de Bolaños
Country name Mexico
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.27 0.22 0.24
   Fixed Charge 0.26 0.08 0.04
   Variable Charge 0.00 0.14 0.19
  Other Charges 0.01 0.01 0.01
  VAT
Tariff reference date: 01 Jan 2019
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.05 0.04 0.05
   Fixed Charge 0.05 0.02 0.01
   Variable Charge 0.00 0.03 0.04
  Other Charges 0.00 0.00 0.00
  VAT
Tariff reference date: 01 Jan 2019
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 4.01 11.14 24.09
  Connection Charge 3.89 3.89 3.89
  Variable Charge 0.00 6.92 19.50
  Other Charges 0.12 0.32 0.70
  VAT
Tariff reference date: 01 Jan 2019
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 0.80 2.23 4.82
  Connection Charge 0.78 0.78 0.78
  Variable Charge 0.00 1.38 3.90
  Other Charges 0.02 0.06 0.14
  VAT
Tariff reference date: 01 Jan 2019
Water Consumption m3 per Month Tariff (USD per m3) Tariff (MXN per m3)
1st Block to 15 0 0
2nd Block 15.01 to 30 0.19 3.76
3rd Block 30.01 to 45 0.2 3.89
4th Block 45.01 to 60 0.22 4.25
5ft Block 60.01 to 75 0.24 4.64
6th Block 75.01 to 90 0.27 5.28
7th Block 90.01 And More 0.28 5.6
Other Charges Charge (USD) Charge (MXN)
Fixed Charge (USD/Mo) 3.89 76.53
Other Percentage Charges (%) 3 3
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (MXN per m3)
1st Block to 15 0 0
2nd Block 15.01 to 30 0.04 0.75
3rd Block 30.01 to 45 0.04 0.78
4th Block 45.01 to 60 0.04 0.85
5ft Block 60.01 to 75 0.05 0.93
6th Block 75.01 to 90 0.05 1.06
7th Block 90.01 And More 0.06 1.12
Other Charges Charge (USD) Charge (MXN)
Fixed Charge (USD/Mo) 0.78 15.31
Other Percentage Charges (%) 3 3