Chesterfield County Department of Utilities(United States)

City name Chesterfield
Country name United States
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.61 1.01 0.89
   Fixed Charge 0.51 0.15 0.08
   Variable Charge 0.76 0.76 0.76
  Other Charges 0.34 0.10 0.05
  VAT
Tariff reference date: 01 Jul 2019
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.74 1.08 0.94
   Fixed Charge 0.94 0.28 0.14
   Variable Charge 0.79 0.79 0.79
  Other Charges
  VAT
Tariff reference date: 01 Jul 2019
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 24.11 50.68 88.65
  Connection Charge 7.64 7.64 7.64
  Variable Charge 11.39 37.96 75.93
  Other Charges 5.08 5.08 5.08
  VAT
Tariff reference date: 01 Jul 2019
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 26.07 53.88 93.61
  Connection Charge 14.15 14.15 14.15
  Variable Charge 11.92 39.73 79.46
  Other Charges
  VAT
Tariff reference date: 01 Jul 2019
Water Consumption m3 per BiMonth Tariff (USD per m3) Tariff (USD per m3)
1st Block All Consumption levels 0.76 0.76
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Bim) 15.28 15.28
Other Fixed Charges (USD/Bim) 10.16 10.16

LINK:

Link status: Not Checked
Last Checked: 11-06-2019
Wastewater Consumption m3 per BiMonth Tariff (USD per m3) Tariff (USD per m3)
1st Block All Consumption levels 0.79 0.79
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Bim) 28.3 28.3

LINK:

Link status: Not Checked
Last Checked: 11-06-2019