EPCOR - Clovis(United States)

City name Clovis
Country name United States
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 2.04 1.51 1.48
   Fixed Charge 1.00 0.30 0.15
   Variable Charge 1.04 1.21 1.33
  Other Charges
  VAT
Tariff reference date: 18 Jul 2019
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 30.63 75.64 148.03
  Connection Charge 15.06 15.06 15.06
  Variable Charge 15.57 60.58 132.97
  Other Charges
  VAT
Tariff reference date: 18 Jul 2019
Water Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block to 16.99 1.04 1.04
2nd Block 17 to 56.63 1.3 1.3
3rd Block 56.64 And More 1.47 1.47
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 15.06 15.06