Mangaung Local Municipality(South Africa)

City name Bloemfontein
Country name South Africa
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.73 0.94 1.04
   Fixed Charge 0.13 0.04 0.02
   Variable Charge 0.51 0.78 0.88
  Other Charges
  VAT 0.10 0.12 0.14
Tariff reference date: 01 Jul 2019
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.45 0.14 0.07
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.39 0.12 0.06
  Other Charges
  VAT 0.06 0.02 0.01
Tariff reference date: 01 Jul 2019
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 10.99 46.83 103.84
  Connection Charge 1.91 1.91 1.91
  Variable Charge 7.65 38.81 88.38
  Other Charges
  VAT 1.43 6.11 13.54
Tariff reference date: 01 Jul 2019
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 6.76 6.76 6.76
  Connection Charge 0.00 0.00 0.00
  Variable Charge 5.88 5.88 5.88
  Other Charges
  VAT 0.88 0.88 0.88
Tariff reference date: 01 Jul 2019
Water Consumption m3 per Month Tariff (USD per m3) Tariff (ZAR per m3)
1st Block to 6 0 0
2nd Block 6.01 to 30 0.85 12
3rd Block 30.01 to 50 0.92 13
4th Block 50.01 And More 0.99 14
Other Charges Charge (USD) Charge (ZAR)
Fixed Charge (USD/Mo) 1.91 27
Tax (VAT) (%) 15 15
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (ZAR per m3)
Flat Rate Tariff All Consumption levels 5.88 83
Other Charges Charge (USD) Charge (ZAR)
Tax (VAT) (%) 15 15