Moji Mirim(Brazil)

City name Moji Mirim
Country name Brazil
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.48 1.68 2.13
   Fixed Charge 0.31 0.09 0.05
   Variable Charge 0.17 1.59 2.08
  Other Charges
  VAT
Tariff reference date: 18 Jul 2019
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.51 1.76 2.23
   Fixed Charge 0.33 0.10 0.05
   Variable Charge 0.18 1.67 2.18
  Other Charges
  VAT
Tariff reference date: 18 Jul 2019
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 7.23 84.01 212.63
  Connection Charge 4.67 4.67 4.67
  Variable Charge 2.56 79.35 207.96
  Other Charges
  VAT
Tariff reference date: 18 Jul 2019
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 7.59 88.24 223.29
  Connection Charge 4.90 4.90 4.90
  Variable Charge 2.69 83.34 218.39
  Other Charges
  VAT
Tariff reference date: 18 Jul 2019
Water Consumption m3 per Month Tariff (USD per m3) Tariff (BRL per m3)
1st Block to 10 0 0
2nd Block 10.01 to 15 0.51 1.93
3rd Block 15.01 to 20 2.09 7.89
4th Block 20.01 to 30 2.11 7.96
5ft Block 30.01 to 40 2.2 8.3
6th Block 40.01 to 50 2.31 8.72
7th Block 50.01 to 75 2.46 9.25
8th Block 75.01 to 100 2.69 10.13
9th Block 100.01 And More 2.94 11.07
Other Charges Charge (USD) Charge (BRL)
Fixed Charge (USD/Mo) 4.67 17.58
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (BRL per m3)
1st Block to 10 0 0
2nd Block 10.01 to 15 0.54 2.03
3rd Block 15.01 to 20 2.2 8.28
4th Block 20.01 to 30 2.22 8.36
5ft Block 30.01 to 40 2.31 8.72
6th Block 40.01 to 50 2.43 9.16
7th Block 50.01 to 75 2.58 9.71
8th Block 75.01 to 100 2.82 10.64
9th Block 100.01 And More 3.08 11.62
Other Charges Charge (USD) Charge (BRL)
Fixed Charge (USD/Mo) 4.9 18.46