Water | Consumption per month in US$/m3 | Calculation | ||
---|---|---|---|---|
15 m3 | 50 m3 | 100 m3 | ||
Tariff | 0.67 | 1.31 | 2.00 | |
Fixed Charge | 0.22 | 0.07 | 0.03 | |
Variable Charge | 0.44 | 1.25 | 1.97 | |
Other Charges | ||||
VAT | ||||
Tariff reference date: 01 Jan 2019 |
Water | Monthly Bill (US$) | Calculation | ||
---|---|---|---|---|
15 m3 | 50 m3 | 100 m3 | ||
Total Bill | 9.98 | 65.64 | 200.28 | |
Connection Charge | 3.34 | 3.34 | 3.34 | |
Variable Charge | 6.65 | 62.30 | 196.95 | |
Other Charges | ||||
VAT | ||||
Tariff reference date: 01 Jan 2019 |
Water | Consumption m3 per Month | Tariff (USD per m3) | Tariff (MXN per m3) |
---|---|---|---|
1st Block | to 5 | 0 | 0 |
2nd Block | 5.01 to 10 | 0.66 | 12.94 |
3rd Block | 10.01 to 15 | 0.67 | 13.2 |
4th Block | 15.01 to 20 | 0.68 | 13.44 |
5ft Block | 20.01 to 25 | 0.92 | 18.07 |
6th Block | 25.01 to 30 | 1.31 | 25.77 |
7th Block | 30.01 to 40 | 1.8 | 35.3 |
8th Block | 40.01 to 50 | 2.31 | 45.46 |
9th Block | 50.01 to 60 | 2.56 | 50.29 |
10th Block | 60.01 And More | 2.73 | 53.6 |
Other Charges | Charge (USD) | Charge (MXN) |
---|---|---|
Fixed Charge (USD/Mo) | 3.34 | 65.56 |