GVWC(Sierra Leone)

City name Freetown
Country name Sierra Leone
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.24 0.27 0.30
   Fixed Charge 0.13 0.04 0.02
   Variable Charge 0.11 0.24 0.28
  Other Charges
  VAT
Tariff reference date: 01 Oct 2006
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 3.62 13.68 30.18
  Connection Charge 1.91 1.91 1.91
  Variable Charge 1.71 11.77 28.27
  Other Charges
  VAT
Tariff reference date: 01 Oct 2006
Water Consumption m3 per Month Tariff (USD per m3) Tariff (SLL per m3)
1st Block to 9.09 0.1 434.78
2nd Block 9.1 to 13.64 0.12 521.74
3rd Block 13.65 to 22.73 0.19 826.09
4th Block 22.74 to 27.28 0.24 1043.48
5ft Block 27.29 And More 0.33 1434.78
Other Charges Charge (USD) Charge (SLL)
Fixed Charge (USD/Mo) 1.91 8304.35