Birmingham Water Works Board(United States)

City name Birmingham
Country name United States
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 2.82 1.83 1.97
   Fixed Charge 1.77 0.53 0.27
   Variable Charge 1.04 1.29 1.70
  Other Charges
  VAT
Tariff reference date: 01 Jan 2020
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 4.32 4.14 4.12
   Fixed Charge 1.45 0.44 0.22
   Variable Charge 2.86 3.71 3.90
  Other Charges
  VAT
Tariff reference date: 01 Jan 2020
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 42.23 91.33 197.10
  Connection Charge 26.60 26.60 26.60
  Variable Charge 15.63 64.73 170.50
  Other Charges
  VAT
Tariff reference date: 01 Jan 2020
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 64.74 207.22 412.22
  Connection Charge 21.78 21.78 21.78
  Variable Charge 42.96 185.44 390.44
  Other Charges
  VAT
Tariff reference date: 01 Jan 2020
Water Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block to 8.5 0.91 0.91
2nd Block 8.51 to 42.48 1.21 1.21
3rd Block 42.49 And More 2.12 2.12
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 26.6 26.6

LINK:

Link status: Not Checked
Last Checked: 27-01-2020
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block to 8.5 2.31 2.31
2nd Block 8.51 to 16.99 3.59 3.59
3rd Block 17 And More 4.1 4.1
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 21.78 21.78

LINK:

Link status: Not Checked
Last Checked: 27-01-2020