Charleston Water System, Charleston, SC(United States)

City name Charleston
Country name United States
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.29 0.86 0.76
   Fixed Charge 0.87 0.26 0.13
   Variable Charge 0.42 0.59 0.63
  Other Charges
  VAT
Tariff reference date: 01 Jan 2020
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 3.86 3.13 2.98
   Fixed Charge 2.11 0.63 0.32
   Variable Charge 1.76 2.50 2.66
  Other Charges
  VAT
Tariff reference date: 01 Jan 2020
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 19.36 42.85 76.40
  Connection Charge 13.10 13.10 13.10
  Variable Charge 6.26 29.75 63.30
  Other Charges
  VAT
Tariff reference date: 01 Jan 2020
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 57.94 156.70 297.78
  Connection Charge 31.60 31.60 31.60
  Variable Charge 26.34 125.10 266.18
  Other Charges
  VAT
Tariff reference date: 01 Jan 2020
Water Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block to 5.66 0 0
2nd Block 5.67 And More 0.67 0.67
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 13.1 13.1

LINK:

Link status: Not Checked
Last Checked: 27-01-2020
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block to 5.66 0 0
2nd Block 5.67 And More 2.82 2.82
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 31.6 31.6

LINK:

Link status: Not Checked
Last Checked: 27-01-2020