SMSB de Viana do Castelo(Portugal)

City name SMSB de Viana do Castelo
Country name Portugal
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.34 2.28 2.63
   Fixed Charge 0.37 0.11 0.06
   Variable Charge 0.89 2.04 2.42
  Other Charges
  VAT 0.08 0.13 0.15
Tariff reference date: 01 Jan 2020
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.24 2.07 2.37
   Fixed Charge 0.37 0.11 0.06
   Variable Charge 0.80 1.84 2.18
  Other Charges
  VAT 0.07 0.12 0.13
Tariff reference date: 01 Jan 2020
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 20.03 114.13 262.72
  Connection Charge 5.53 5.53 5.53
  Variable Charge 13.37 102.15 242.32
  Other Charges
  VAT 1.13 6.46 14.87
Tariff reference date: 01 Jan 2020
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 18.62 103.31 237.04
  Connection Charge 5.53 5.53 5.53
  Variable Charge 12.04 91.93 218.10
  Other Charges
  VAT 1.05 5.85 13.42
Tariff reference date: 01 Jan 2020
Water Consumption m3 per Month Tariff (USD per m3) Tariff (EUR per m3)
1st Block to 5 0.31 0.27
2nd Block 5.01 to 15 1.18 1.06
3rd Block 15.01 to 25 1.87 1.67
4th Block 25.01 And More 2.8 2.5
Other Charges Charge (USD) Charge (EUR)
Fixed Charge (USD/Mo) 5.53 4.93
Tax (VAT) (%) 6 6

LINK:

Link status: Not Checked
Last Checked: 25-02-2020
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (EUR per m3)
1st Block to 5 0.28 0.25
2nd Block 5.01 to 15 1.07 0.95
3rd Block 15.01 to 25 1.68 1.5
4th Block 25.01 And More 2.52 2.25
Other Charges Charge (USD) Charge (EUR)
Fixed Charge (USD/Mo) 5.53 4.93
Tax (VAT) (%) 6 6

LINK:

Link status: Not Checked
Last Checked: 25-02-2020