Administración de Acueductos y Alcantarillados (ANDA)(El Salvador)

City name El Salvador National Company
Country name El Salvador
Tariff structure type Other
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.21 1.65 2.90
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.21 1.65 2.90
  Other Charges
  VAT
Tariff reference date: 01 Oct 2015
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.01 0.08 0.08
   Fixed Charge 0.01 0.08 0.08
   Variable Charge 0.00 0.00 0.00
  Other Charges
  VAT
Tariff reference date: 01 Oct 2015
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 3.15 82.50 290.00
  Connection Charge 0.00 0.00 0.00
  Variable Charge 3.15 82.50 290.00
  Other Charges
  VAT
Tariff reference date: 01 Oct 2015
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 0.10 4.00 7.50
  Connection Charge 0.10 4.00 7.50
  Variable Charge 0.00 0.00 0.00
  Other Charges
  VAT
Tariff reference date: 01 Oct 2015
Water Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
Other Charges Charge (USD) Charge (USD)

LINK:

Link status: Link Alive
Last Checked: 19-04-2017
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block to 20 0 0
2nd Block 20.01 to 30 0 0
3rd Block 30.01 to 40 0 0
4th Block 40.01 to 50 0 0
5ft Block 50.01 to 100 0 0
6th Block 100.01 to 500 0 0
7th Block 500.01 And More 0 0
Other Charges Charge (USD) Charge (USD)
Fixed Charge 1st Block (USD/m3) 0.1 0.1
Fixed Charge 2nd Block (USD/m3) 1.8 1.8
Fixed Charge 3rd Block (USD/m3) 3 3
Fixed Charge 4th Block (USD/m3) 4 4
Fixed Charge 5th Block (USD/m3) 7.5 7.5
Fixed Charge 6th Block (USD/m3) 10 10
Fixed Charge 7th Block (USD/m3) 20 20

LINK:

Link status: Link Alive
Last Checked: 19-04-2017