Water & Sewerage Authority(Trinidad and Tobago)

City name Port of Spain
Country name Trinidad and Tobago
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.31 0.31 0.46
   Fixed Charge 0.12 0.04 0.02
   Variable Charge 0.19 0.27 0.44
  Other Charges
  VAT
Tariff reference date: 01 Jan 1993
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.15 0.15 0.23
   Fixed Charge 0.06 0.02 0.01
   Variable Charge 0.10 0.14 0.22
  Other Charges
  VAT
Tariff reference date: 01 Jan 1993
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 4.61 15.36 46.09
  Connection Charge 1.76 1.76 1.76
  Variable Charge 2.85 13.61 44.34
  Other Charges
  VAT
Tariff reference date: 01 Jan 1993
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 2.30 7.68 23.05
  Connection Charge 0.88 0.88 0.88
  Variable Charge 1.43 6.80 22.17
  Other Charges
  VAT
Tariff reference date: 01 Jan 1993
Water Consumption m3 per Quarterly Tariff (USD per m3) Tariff (TTD per m3)
1st Block to 17.14 0 0
2nd Block 17.15 to 150 0.31 1.75
3rd Block 150.01 And More 0.61 3.5
Other Charges Charge (USD) Charge (TTD)
Fixed Charge (USD/Tri) 5.27 30

LINK:

Link status: Link Alive
Last Checked: 10-01-2018
Wastewater Consumption m3 per Quarterly Tariff (USD per m3) Tariff (TTD per m3)
1st Block to 17.14 0 0
2nd Block 17.15 to 150 0.15 0.88
3rd Block 150.01 And More 0.31 1.75
Other Charges Charge (USD) Charge (TTD)
Fixed Charge (USD/Tri) 2.63 15

LINK:

Link status: Link Alive
Last Checked: 10-01-2018