RPCC. Rangpur(Bangladesh)

City name RPCC. Rangpur
Country name Bangladesh
Tariff structure type Flat Rate
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.17 0.05 0.03
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.17 0.05 0.03
  Other Charges
  VAT
Tariff reference date: 01 Jan 2015
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 2.52 2.52 2.52
  Connection Charge 0.00 0.00 0.00
  Variable Charge 2.52 2.52 2.52
  Other Charges
  VAT
Tariff reference date: 01 Jan 2015
Water Consumption m3 per Month Tariff (USD per m3) Tariff (BDT per m3)
Flat Rate Tariff All Consumption levels 2.52 200
Other Charges Charge (USD) Charge (BDT)