Water Corporation - Busselton (sewerage)(Australia)

City name Busselton
Country name Australia
Tariff structure type Jump Tariffs
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 2.68 5.04 4.89
   Fixed Charge 1.01 0.30 0.15
   Variable Charge 1.67 4.74 4.74
  Other Charges
  VAT
Tariff reference date: 01 Jul 2020
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 40.25 251.93 488.70
  Connection Charge 15.15 15.15 15.15
  Variable Charge 25.10 236.78 473.56
  Other Charges
  VAT
Tariff reference date: 01 Jul 2020
Water Consumption m3 per Year Tariff (USD per m3) Tariff (AUD per m3)
1st Block to 150 1.26 1.83
2nd Block 150.01 to 300 1.67 2.43
3rd Block 300.01 to 550 3.16 4.59
4th Block 550.01 And More 4.74 6.89
Other Charges Charge (USD) Charge (AUD)
Fixed Charge (USD/Yr) 181.77 264.35