Portland Bureau Of Environmental Services and Portland Water Bureau(United States)

City name Portland
Country name United States
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 3.10 2.31 2.14
   Fixed Charge 1.13 0.34 0.17
   Variable Charge 1.98 1.98 1.98
  Other Charges
  VAT
Tariff reference date: 01 Jul 2020
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 6.12 4.72 4.42
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 4.08 4.08 4.08
  Other Charges 2.05 0.64 0.34
  VAT
Tariff reference date: 01 Jul 2020
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 46.54 115.67 214.43
  Connection Charge 16.92 16.92 16.92
  Variable Charge 29.63 98.76 197.52
  Other Charges
  VAT
Tariff reference date: 01 Jul 2020
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 91.87 236.11 442.17
  Connection Charge 0.00 0.00 0.00
  Variable Charge 61.18 203.94 407.89
  Other Charges 30.69 32.17 34.29
  VAT
Tariff reference date: 01 Jul 2020
Water Consumption m3 per Quarterly Tariff (USD per m3) Tariff (USD per m3)
1st Block All Consumption levels 1.98 1.98
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Tri) 50.75 50.75

LINK:

Link status: Link Alive
Last Checked: 30-03-2021
Wastewater Consumption m3 per Quarterly Tariff (USD per m3) Tariff (USD per m3)
1st Block All Consumption levels 4.08 4.08
Other Charges Charge (USD) Charge (USD)
Other Wastewater Charges (USD/Mo) 30.05 30.05
Other Volumetric Charges (USD/ccf) 0.04 0.04

LINK:

Link status: Link Alive
Last Checked: 30-03-2021