Empresa De Acueducto Y Alcantarillado De Pereira S.A. E.S.P.(Colombia)

City name Pereira - Risaralda
Country name Colombia
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.63 0.51 0.48
   Fixed Charge 0.17 0.05 0.03
   Variable Charge 0.46 0.46 0.46
  Other Charges
  VAT
Tariff reference date: 01 Mar 2020
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.63 0.56 0.55
   Fixed Charge 0.09 0.03 0.01
   Variable Charge 0.53 0.53 0.53
  Other Charges
  VAT
Tariff reference date: 01 Mar 2020
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 9.40 25.46 48.39
  Connection Charge 2.52 2.52 2.52
  Variable Charge 6.88 22.93 45.87
  Other Charges
  VAT
Tariff reference date: 01 Mar 2020
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 9.38 28.08 54.79
  Connection Charge 1.36 1.36 1.36
  Variable Charge 8.01 26.71 53.43
  Other Charges
  VAT
Tariff reference date: 01 Mar 2020
Water Consumption m3 per Month Tariff (USD per m3) Tariff (COP per m3)
1st Block to 13 0.46 1638.16
2nd Block 13.01 And More 0.46 1638.16
Other Charges Charge (USD) Charge (COP)
Fixed Charge (USD/Mo) 2.52 9006.25

LINK:

Link status: Not Checked
Last Checked: 07-10-2020
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (COP per m3)
1st Block to 13 0.53 1908.08
2nd Block 13.01 And More 0.53 1908.08
Other Charges Charge (USD) Charge (COP)
Fixed Charge (USD/Mo) 1.36 4865.01

LINK:

Link status: Not Checked
Last Checked: 07-10-2020