Charleston Water System, Charleston, SC(United States)

City name Charleston
Country name United States
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.32 0.88 0.79
   Fixed Charge 0.89 0.27 0.13
   Variable Charge 0.43 0.62 0.66
  Other Charges
  VAT
Tariff reference date: 01 Jan 2021
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 3.96 3.22 3.06
   Fixed Charge 2.16 0.65 0.32
   Variable Charge 1.80 2.57 2.74
  Other Charges
  VAT
Tariff reference date: 01 Jan 2021
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 19.85 44.20 78.98
  Connection Charge 13.35 13.35 13.35
  Variable Charge 6.50 30.85 65.63
  Other Charges
  VAT
Tariff reference date: 01 Jan 2021
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 59.47 160.95 305.91
  Connection Charge 32.40 32.40 32.40
  Variable Charge 27.07 128.55 273.51
  Other Charges
  VAT
Tariff reference date: 01 Jan 2021
Water Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block to 5.66 0 0
2nd Block 5.67 And More 0.7 0.7
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 13.35 13.35

LINK:

Link status: Not Checked
Last Checked: 18-01-2021
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (USD per m3)
1st Block to 5.66 0 0
2nd Block 5.67 And More 2.9 2.9
Other Charges Charge (USD) Charge (USD)
Fixed Charge (USD/Mo) 32.4 32.4

LINK:

Link status: Not Checked
Last Checked: 18-01-2021