JSC Poti Vodokanal(Georgia)

City name Poti
Country name Georgia
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 2.42 2.42 2.42
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 2.05 2.05 2.05
  Other Charges
  VAT 0.37 0.37 0.37
Tariff reference date: 01 Aug 2011
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.93 0.93 0.93
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.79 0.79 0.79
  Other Charges
  VAT 0.14 0.14 0.14
Tariff reference date: 01 Aug 2011
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 36.36 121.22 242.43
  Connection Charge 0.00 0.00 0.00
  Variable Charge 30.82 102.73 205.45
  Other Charges
  VAT 5.55 18.49 36.98
Tariff reference date: 01 Aug 2011
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 13.90 46.35 92.70
  Connection Charge 0.00 0.00 0.00
  Variable Charge 11.78 39.28 78.56
  Other Charges
  VAT 2.12 7.07 14.14
Tariff reference date: 01 Aug 2011
Water Consumption m3 per Month Tariff (USD per m3) Tariff (GEL per m3)
1st Block All Consumption levels 2.05 3.4
Other Charges Charge (USD) Charge (GEL)
Tax (VAT) (%) 18 18

LINK:

Link status: Link Alive
Last Checked: 21-04-2017
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (GEL per m3)
1st Block All Consumption levels 0.79 1.3
Other Charges Charge (USD) Charge (GEL)
Tax (VAT) (%) 18 18

LINK:

Link status: Link Alive
Last Checked: 21-04-2017