Tianjin WaterWorks (Group) Company Ltd.(China)

City name TianJin
Country name China
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.62 0.92 1.01
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.40 0.71 0.79
  Other Charges 0.21 0.21 0.21
  VAT
Tariff reference date: 01 Jan 2016
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.14 0.14 0.14
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.14 0.14 0.14
  Other Charges
  VAT
Tariff reference date: 01 Jan 2016
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 9.24 46.13 100.81
  Connection Charge 0.00 0.00 0.00
  Variable Charge 6.03 35.42 79.40
  Other Charges 3.21 10.70 21.41
  VAT
Tariff reference date: 01 Jan 2016
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 2.08 6.93 13.86
  Connection Charge 0.00 0.00 0.00
  Variable Charge 2.08 6.93 13.86
  Other Charges
  VAT
Tariff reference date: 01 Jan 2016
Water Consumption m3 per Year Tariff (USD per m3) Tariff (CNY per m3)
1st Block to 180 0.4 2.61
2nd Block 180.01 to 240 0.6 3.91
3rd Block 240.01 And More 0.88 5.71
Other Charges Charge (USD) Charge (CNY)
Other Volumetric Charges (USD/m3) 0.21 1.39
Wastewater Consumption m3 per Year Tariff (USD per m3) Tariff (CNY per m3)
1st Block All Consumption levels 0.14 0.9
Other Charges Charge (USD) Charge (CNY)