Azzoun Municipality(West Bank and Gaza)

City name Azzoun
Country name West Bank and Gaza
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.65 0.69 0.99
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.65 0.69 0.99
  Other Charges
  VAT
Tariff reference date: 01 Jul 2016
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 9.71 34.32 99.07
  Connection Charge 0.00 0.00 0.00
  Variable Charge 9.71 34.32 99.07
  Other Charges
  VAT
Tariff reference date: 01 Jul 2016
Water Consumption m3 per Month Tariff (USD per m3) Tariff (ILS per m3)
1st Block to 20 0.65 2.5
2nd Block 20.01 to 50 0.71 2.75
3rd Block 50.01 And More 1.3 5
Other Charges Charge (USD) Charge (ILS)
Fixed Charge (USD/Mo) 0 0