Stadt Zurich Wasserversorgung(Switzerland)

City name Zurich
Country name Switzerland
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.98 1.37 1.24
   Fixed Charge 0.84 0.25 0.13
   Variable Charge 1.09 1.09 1.09
  Other Charges
  VAT 0.05 0.03 0.03
Tariff reference date: 01 Jan 2016
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 2.81 2.12 1.97
   Fixed Charge 0.91 0.27 0.14
   Variable Charge 1.70 1.70 1.70
  Other Charges
  VAT 0.20 0.15 0.14
Tariff reference date: 21 Oct 2015
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 29.63 68.66 124.41
  Connection Charge 12.59 12.59 12.59
  Variable Charge 16.32 54.39 108.79
  Other Charges
  VAT 0.72 1.67 3.03
Tariff reference date: 01 Jan 2016
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 42.16 106.12 197.47
  Connection Charge 13.70 13.70 13.70
  Variable Charge 25.45 84.83 169.65
  Other Charges
  VAT 3.01 7.59 14.12
Tariff reference date: 21 Oct 2015
Water Consumption m3 per Year Tariff (USD per m3) Tariff (CHF per m3)
1st Block All Consumption levels 1.09 1.08
Other Charges Charge (USD) Charge (CHF)
Fixed Charge (USD/Yr) 151.09 150
Tax (VAT) (%) 2.5 2.5
Wastewater Consumption m3 per Year Tariff (USD per m3) Tariff (EUR per m3)
1st Block All Consumption levels 1.7 1.62
Other Charges Charge (USD) Charge (EUR)
Fixed Charge (USD/Yr) 164.42 157
Tax (VAT) (%) 7.7 7.7