Addis Ababa Water and Sewerage Authority(Ethiopia)

City name Addis Ababa
Country name Ethiopia
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.14 0.21 0.25
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.14 0.21 0.25
  Other Charges
  VAT
Tariff reference date: 01 Dec 2014
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 2.14 10.59 25.08
  Connection Charge 0.06 0.06 0.06
  Variable Charge 2.08 10.53 25.02
  Other Charges
  VAT
Tariff reference date: 01 Dec 2014
Water Consumption m3 per Month Tariff (USD per m3) Tariff (BIRR per m3)
1st Block to 7 0.08 1.63
2nd Block 7.01 to 20 0.19 3.87
3rd Block 20.01 to 40 0.23 4.68
4th Block 40.01 to 100 0.29 5.9
5ft Block 100.01 to 300 0.37 7.53
6th Block 300.01 to 500 0.46 9.36
7th Block 500.01 And More 0.58 11.81
Other Charges Charge (USD) Charge (BIRR)
Fixed Charge (USD/Mo) 0.06 1.22