Empresa De Servicios Publicos De Granada(Colombia)

City name Granada
Country name Colombia
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.28 0.24 0.24
   Fixed Charge 0.05 0.01 0.01
   Variable Charge 0.23 0.23 0.23
  Other Charges
  VAT
Tariff reference date: 01 Dec 2015
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.11 0.10 0.09
   Fixed Charge 0.02 0.01 0.00
   Variable Charge 0.09 0.09 0.09
  Other Charges
  VAT
Tariff reference date: 01 Dec 2015
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 4.14 12.14 23.58
  Connection Charge 0.70 0.70 0.70
  Variable Charge 3.43 11.44 22.88
  Other Charges
  VAT
Tariff reference date: 01 Dec 2015
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 1.65 4.86 9.43
  Connection Charge 0.28 0.28 0.28
  Variable Charge 1.37 4.58 9.15
  Other Charges
  VAT
Tariff reference date: 01 Dec 2015
Water Consumption m3 per Month Tariff (USD per m3) Tariff (COP per m3)
1st Block to 20 0.23 715
2nd Block 20.01 to 40 0.23 715
3rd Block 40.01 And More 0.23 715
Other Charges Charge (USD) Charge (COP)
Fixed Charge (USD/Mo) 0.7 2202
Link status: Link Not Working
Last Checked: 12-10-2017
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (COP per m3)
1st Block to 20 0.09 286
2nd Block 20.01 to 40 0.09 286
3rd Block 40.01 And More 0.09 286
Other Charges Charge (USD) Charge (COP)
Fixed Charge (USD/Mo) 0.28 881
Link status: Link Not Working
Last Checked: 12-10-2017