Javno poduzeće Komunalno d.o.o. Livno(Bosnia and Herzegovina)

City name Livno
Country name Bosnia and Herzegovina
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.84 0.76 0.74
   Fixed Charge 0.10 0.03 0.02
   Variable Charge 0.59 0.59 0.59
  Other Charges 0.03 0.03 0.03
  VAT 0.12 0.11 0.11
Tariff reference date: 13 Oct 2017
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.24 0.24 0.24
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.21 0.21 0.21
  Other Charges
  VAT 0.03 0.03 0.03
Tariff reference date: 13 Oct 2017
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 12.62 37.93 74.10
  Connection Charge 1.51 1.51 1.51
  Variable Charge 8.88 29.61 59.23
  Other Charges 0.39 1.30 2.60
  VAT 1.83 5.51 10.77
Tariff reference date: 13 Oct 2017
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 3.61 12.02 24.04
  Connection Charge 0.00 0.00 0.00
  Variable Charge 3.08 10.27 20.55
  Other Charges
  VAT 0.52 1.75 3.49
Tariff reference date: 13 Oct 2017
Water Consumption m3 per Month Tariff (USD per m3) Tariff (BAM per m3)
1st Block All Consumption levels 0.59 0.98
Other Charges Charge (USD) Charge (BAM)
Fixed Charge (USD/Mo) 1.51 2.5
Other Volumetric Charges (USD/m3) 0.03 0.04
Tax (VAT) (%) 17 17

LINK:

Link status: Not Checked
Last Checked: 13-10-2017
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (BAM per m3)
1st Block All Consumption levels 0.21 0.34
Other Charges Charge (USD) Charge (BAM)
Tax (VAT) (%) 17 17

LINK:

Link status: Not Checked
Last Checked: 13-10-2017