Empresa Municipal de Agua(Guatemala)

City name Guatemala
Country name Guatemala
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.44 0.39 0.60
   Fixed Charge 0.19 0.06 0.03
   Variable Charge 0.20 0.29 0.51
  Other Charges
  VAT 0.05 0.04 0.06
Tariff reference date: 04 Dec 2017
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.05 0.06 0.11
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.04 0.06 0.10
  Other Charges
  VAT 0.00 0.01 0.01
Tariff reference date: 04 Dec 2017
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 6.55 19.38 60.26
  Connection Charge 2.79 2.79 2.79
  Variable Charge 3.05 14.51 51.01
  Other Charges
  VAT 0.70 2.08 6.46
Tariff reference date: 04 Dec 2017
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 0.68 3.25 11.43
  Connection Charge 0.00 0.00 0.00
  Variable Charge 0.61 2.90 10.20
  Other Charges
  VAT 0.07 0.35 1.22
Tariff reference date: 04 Dec 2017
Water Consumption m3 per Month Tariff (USD per m3) Tariff (GTQ per m3)
1st Block to 20 0.2 1.53
2nd Block 20.01 to 40 0.32 2.4
3rd Block 40.01 to 60 0.41 3.05
4th Block 60.01 to 120 0.81 6.1
5ft Block 120.01 And More 1.01 7.63
Other Charges Charge (USD) Charge (GTQ)
Fixed Charge (USD/Mo) 2.79 21
Tax (VAT) (%) 12 12
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (GTQ per m3)
1st Block to 20 0.04 0.31
2nd Block 20.01 to 40 0.06 0.48
3rd Block 40.01 to 60 0.08 0.61
4th Block 60.01 to 120 0.16 1.22
5ft Block 120.01 And More 0.2 1.53
Other Charges Charge (USD) Charge (GTQ)
Tax (VAT) (%) 12 12