Javno Komunalno Preduzeće "Tomislavgrad"- Tomislavgrad(Bosnia and Herzegovina)

City name Tomislavgrad
Country name Bosnia and Herzegovina
Tariff structure type Volumetric
Water Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 1.04 0.88 0.85
   Fixed Charge 0.19 0.06 0.03
   Variable Charge 0.70 0.70 0.70
  Other Charges
  VAT 0.15 0.13 0.12
Tariff reference date: 13 Oct 2015
Wastewater Consumption per month in US$/m3 Calculation
15 m3 50 m3 100 m3
Tariff 0.24 0.24 0.24
   Fixed Charge 0.00 0.00 0.00
   Variable Charge 0.21 0.21 0.21
  Other Charges
  VAT 0.04 0.04 0.04
Tariff reference date: 13 Oct 2015
Water Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 15.64 44.21 85.02
  Connection Charge 2.91 2.91 2.91
  Variable Charge 10.46 34.88 69.76
  Other Charges
  VAT 2.27 6.42 12.35
Tariff reference date: 13 Oct 2015
Wastewater Monthly Bill (US$) Calculation
15 m3 50 m3 100 m3
Total Bill 3.67 12.24 24.49
  Connection Charge 0.00 0.00 0.00
  Variable Charge 3.14 10.46 20.93
  Other Charges
  VAT 0.53 1.78 3.56
Tariff reference date: 13 Oct 2015
Water Consumption m3 per Month Tariff (USD per m3) Tariff (BAM per m3)
1st Block All Consumption levels 0.7 1.2
Other Charges Charge (USD) Charge (BAM)
Fixed Charge (USD/Mo) 2.91 5
Tax (VAT) (%) 17 17
Wastewater Consumption m3 per Month Tariff (USD per m3) Tariff (BAM per m3)
1st Block All Consumption levels 0.21 0.36
Other Charges Charge (USD) Charge (BAM)
Tax (VAT) (%) 17 17